Quality Summary
First-pass yield, reject rate, and top-10 defect codes for a period.
Inspection plans, incoming and in-process inspection, non-conformance, corrective action, holds and certificates, tied to the exact lot or order.
| Hold Number | Hold Type | Lot | Work Order | Placed Date | Placed By |
|---|---|---|---|---|---|
| QH-72807 | Lot | LTS-57481 | WO-19238 | 20 Sep | RM |
| QH-74332 | GoodsReceipt | LTS-52544 | WO-19744 | 21 Sep | JN |
| QH-46332 | WorkOrderOperation | LTS-62401 | WO-51605 | 07 Sep | DN |
| QH-50967 | Lot | LTS-11987 | WO-31032 | 18 Sep | CP |
| QH-39175 | GoodsReceipt | LTS-58010 | WO-81449 | 23 Sep | EW |
| QH-66629 | WorkOrderOperation | LTS-22564 | WO-11106 | 05 Sep | MM |
An inspection plan says what to check for an item at a point: incoming, in-process at an operation, or final before release. It lists characteristics, the method, the specification limits and the sampling rule. Plans are versioned and attached to the item and to routing operations.
An inspection is raised automatically by a goods receipt or a flagged operation. The inspector records measured values or pass and fail per characteristic and dispositions the lot: accept, reject, rework, return to supplier, or use as is with a named approval. The disposition moves stock or releases the operation.
A failed inspection, a customer complaint or a floor observation raises a non-conformance report. It is contained (the lot is held), investigated (root cause with a method such as five whys or fishbone), and closed with a corrective action that has an owner, a due date and a verification step. The CAPA log is what an auditor reads.
A quality hold freezes a lot, a receipt or a work-order operation. Nothing on hold can be issued, shipped or completed. Release requires the inspector’s disposition, and the hold history stays on the record.
Certificates of conformance and material test reports are attached to the supplier lot and travel with it. The traceability view answers both directions: which lots and operations produced this serial, and where every unit of this supplier lot went.
Gauges and instruments have calibration intervals. An overdue instrument must be blocked from a new inspection. The rollout rehearsal checks the due-date boundary and the handling of results already recorded with an instrument that later fails calibration. InspectionResults retain the selected instrument and recorded time so the Quality Inspector can identify affected inspections and decide whether they need review.
Items, bills of material, routings and engineering change, with revision control on all of it.
Demand, master schedule, MRP and capacity: from what customers want to what the plant and suppliers must do, with every planned order traceable to its demand.
Work orders, dispatch, operations, labour, material issue, scrap and completion, recorded where the work happens.
Warehouses, locations, lots and serials, every stock movement, cycle counting and valuation that reconciles to the ledger.
Requisitions, sourcing, purchase orders, receiving, three-way match and supplier performance, with approval where money is committed.
Inspection plans, incoming and in-process inspection, non-conformance, corrective action, holds and certificates, tied to the exact lot or order.
Standard costs, cost rollups, work-in-progress, variances and the journal entries that make every movement a posting.
First-pass yield, reject rate, and top-10 defect codes for a period.
| Hold Number | Hold Type | Lot | Work Order | Placed Date |
|---|---|---|---|---|
| QH-72807 | Lot | LTS-57481 | WO-19238 | 20 Sep |
| QH-74332 | GoodsReceipt | LTS-52544 | WO-19744 | 21 Sep |
| QH-46332 | WorkOrderOperation | LTS-62401 | WO-51605 | 07 Sep |
| QH-50967 | Lot | LTS-11987 | WO-31032 | 18 Sep |
| QH-39175 | GoodsReceipt | LTS-58010 | WO-81449 | 23 Sep |
| QH-66629 | WorkOrderOperation | LTS-22564 | WO-11106 | 05 Sep |
Performs inspections and dispositions non-conforming material.
Manage InspectionPlans, InspectionCharacteristics, QualityInspections, InspectionResults, NonConformanceReports, CorrectiveActions, QualityHolds, Certificates, InstrumentsUpdate GoodsReceipts.Status after incoming inspectionPlace WorkOrderOperations on holdApprove quality release and record QualityHolds.ReleasedBy and ReleasedDateApproval conditions.
Requisition, approval, purchase order, receipt, inspection, three-way match and payment authorisation, with segregation of duties built in.
6 stages · 2 approvals
How a failed inspection is contained, investigated and closed, and how a held lot gets back into use or out of the building.
6 stages · 3 approvals
Changing an item, a bill or a routing without breaking the jobs already on the floor or the stock already on the shelf.
6 stages · 1 approval
Create your ERP.AI account and get started with Proto.
We use essential cookies to run the site and optional cookies for features, analytics, and relevant content. See Cookie policy
We use cookies to enhance your experience, analyze site traffic, and serve relevant content. By clicking "Accept All," you agree to our use of cookies. You can customize your preferences at any time.
Learn more about how we use cookiesThese cookies are required for the website to function properly. They ensure security, enable basic features like page navigation, and store user session data. You cannot disable these cookies.
These cookies enable additional features that enhance your experience, such as live chat, video playback, personalized content recommendations, and remembering user preferences.
These cookies help us understand how visitors interact with our site by collecting anonymous usage data. This allows us to measure performance, detect issues, and continuously improve the user experience.
These cookies allow us and advertising partners, including X, to deliver ads tailored to your interests. They track browsing habits across sites to provide relevant advertising and measure ad effectiveness.