These cookies are required for the website to function properly. They ensure security, enable basic features like page navigation, and store user session data. You cannot disable these cookies.
Get started
Plan Manufacturing ERP for your plant: confirm the scope, configure the application and rehearse the work before launch.
Example workspace
Shop floor →
Approval conditions
Planner reviews suggestions, releases WorkOrders (Status: Planned → Released), and WorkOrderComponents + WorkOrderOperations are generated from the referenced BOM and Routing.
StatusPlannedReleasedInProgress
| Work Order Number | Product | Quantity Ordered | Quantity Completed | Planned Start |
|---|---|---|---|---|
| WO-12156 | PRD-5525 | 50 | 0 | 21 Sep |
| WO-61333 | PRD-6326 | 550 | 0 | 26 Sep |
| WO-59893 | PRD-3945 | 210 | 70 | 16 Sep |
| WO-72971 | PRD-5394 | 840 | 0 | 18 Sep |
| WO-14931 | PRD-8370 | 50 | 0 | 19 Sep |
| WO-92173 | PRD-9069 | 520 | 300 | 15 Sep |
-
1
Start with Proto
Click Start now, then use Proto to configure Manufacturing ERP for your business. Set up your workflows, import your data and invite your team.
Use the modules, process pages and data model to identify what your plant needs before the application is configured in the ERP.ai engine.
Start now -
2
Talk about a rollout
If you are moving a plant onto it, tell us about the operation: products, sites, the systems in place, and what has to go live first. We will come back with a phased plan and a scope.
Write to [email protected] -
3
Bring your agent
Include the agent's work in the rollout scope. Once the application is configured, give it a separate identity with the relevant role and rehearse its reads, drafts and human approval handoffs before enabling writes.
$ curl -fsSL https://www.erp.ai/skill.md | paste into your agentDownload agent
Who does what: the roles, their records and the human decisions that require independent approval.
ReportsReports and dashboardsThe numbers a plant runs on, each with what it answers and who reads it, all built on the same postings as the ledger.
Data modelData modelThe tables, their keys and how they relate, written for the consultant or IT team that has to migrate into it or integrate with it.
IntegrationsIntegrationsWhat a plant connects to a manufacturing ERP, and how each connection works here: CAD and PLM, EDI, accounting, scanners, machines, carriers and e-commerce.
RolloutImplementationHow a plant goes live: mapping the operating model, configuring, migrating, rehearsing, and launching one process at a time.
APIAgent and APIHow an agent runs Manufacturing ERP: identity, permissions, the calls it makes, and what it may not do without a person.
Modules
-
Product engineering
Items, bills of material, routings and engineering change, with revision control on all of it.
-
Planning
Demand, master schedule, MRP and capacity: from what customers want to what the plant and suppliers must do, with every planned order traceable to its demand.
-
Shop floor
Work orders, dispatch, operations, labour, material issue, scrap and completion, recorded where the work happens.
-
Inventory
Warehouses, locations, lots and serials, every stock movement, cycle counting and valuation that reconciles to the ledger.
-
Purchasing
Requisitions, sourcing, purchase orders, receiving, three-way match and supplier performance, with approval where money is committed.
-
Quality
Inspection plans, incoming and in-process inspection, non-conformance, corrective action, holds and certificates, tied to the exact lot or order.
-
Costing and finance
Standard costs, cost rollups, work-in-progress, variances and the journal entries that make every movement a posting.