Estimates & contractsBuild a clear offer and carry the agreed scope into every project. Projects & costsSee the cost of each job alongside its budget, commitments and remaining work. Purchasing & subcontractorsConnect supplier commitments, accepted work and bills to the right job. Materials & sitesKnow what is available, where it is held and what each job has used.
Production & prefabricationTurn released designs and actual workshop work into traceable finished assemblies. Billing & collectionsTurn agreed progress into clear bills and keep collections tied to the right contract. FinanceBring project economics, supplier obligations and collections into each company’s books. ReportingBring project progress, cost and financial obligations into a consistent review.

Construction ERP

Start now
Pricing Frequently asked questions Get started
Build with Proto

Processes

Order to cashCarry an approved goods order through actual shipment, billing and collection. Estimate to contractCarry a reviewed estimate into an agreed scope, budget and financial basis. Procure to payMatch supplier commitments to real deliveries, accepted subcontract work and payment.
Record and certify workConnect accepted site activity to a reviewable customer progress application. Prefabricate to stockMake accepted assemblies from released work, traced material and actual workshop cost. Bill and collectBill eligible contract scope and keep advances, retention and cash reconciled.

Construction ERP

Start now
Pricing Frequently asked questions Get started
Build with Proto

Industries

Commercial contractorsConnect the accepted bid with project delivery, subcontractors and financial results. Specialty contractorsPlan trade work, follow site materials and see what each job costs.
Contractors with prefabricationConnect workshop production with site installation and project costs. Fit-out and multi-site contractorsKeep each site accountable while sharing purchasing and company finance.

Construction ERP

Start now
Pricing Frequently asked questions Get started
Build with Proto

Reference

Roles and permissionsGive commercial, project, site and finance teams clear responsibilities. Reports and insightsUnderstand project costs, billing progress and company performance. Data modelExplore the records connecting contracts, project work and company finance.
IntegrationsConnect project documents, site evidence and finance through agreed sources. ImplementationBuild the first rollout around a job, its delivery and its financial result. AI assistants and APIHelp teams prepare work, follow projects and investigate differences.

Construction ERP

Start now
Pricing Frequently asked questions Get started
Build with Proto
All systems
Modules
Estimates & contractsBuild a clear offer and carry the agreed scope into every project.Projects & costsSee the cost of each job alongside its budget, commitments and remaining work.Purchasing & subcontractorsConnect supplier commitments, accepted work and bills to the right job.Materials & sitesKnow what is available, where it is held and what each job has used.Production & prefabricationTurn released designs and actual workshop work into traceable finished assemblies.Billing & collectionsTurn agreed progress into clear bills and keep collections tied to the right contract.FinanceBring project economics, supplier obligations and collections into each company’s books.ReportingBring project progress, cost and financial obligations into a consistent review.
Processes
Order to cashCarry an approved goods order through actual shipment, billing and collection.Estimate to contractCarry a reviewed estimate into an agreed scope, budget and financial basis.Procure to payMatch supplier commitments to real deliveries, accepted subcontract work and payment.Record and certify workConnect accepted site activity to a reviewable customer progress application.Prefabricate to stockMake accepted assemblies from released work, traced material and actual workshop cost.Bill and collectBill eligible contract scope and keep advances, retention and cash reconciled.
Industries
Commercial contractorsConnect the accepted bid with project delivery, subcontractors and financial results.Specialty contractorsPlan trade work, follow site materials and see what each job costs.Contractors with prefabricationConnect workshop production with site installation and project costs.Fit-out and multi-site contractorsKeep each site accountable while sharing purchasing and company finance.
Reference
Roles and permissionsGive commercial, project, site and finance teams clear responsibilities.Reports and insightsUnderstand project costs, billing progress and company performance.Data modelExplore the records connecting contracts, project work and company finance.IntegrationsConnect project documents, site evidence and finance through agreed sources.ImplementationBuild the first rollout around a job, its delivery and its financial result.AI assistants and APIHelp teams prepare work, follow projects and investigate differences.
Sign in
Sign in Start now
Construction ERP

Keep every job on budget and moving forward.

Bring estimates, project costs, materials and subcontractors together from bid to final payment.

Start now Download agent
Explore
  • Modules
  • Processes
  • Industries
  • Reference
Offers DueQuotes
Estimates & contractsProjects & costsPurchasing & subcontractorsMaterials & sitesProduction & prefabricationBilling & collectionsFinanceReporting
StatusDraftSentAcceptednext 7 days
Draft
QTS-65480ACC-110
QTS-18840ACC-120
Sent
QTS-10501ACC-110
QTS-96792ACC-150
Accepted
QTS-64425ACC-110
QTS-61027ACC-110
Estimates & contracts →

Illustrative records derived from the system specification.

Explore the specification

Built for construction teams

Mid-market commercial general contractors and specialty contractors, including in-house prefabrication teams.

  • Commercial contractors
  • Specialty contractors
  • Contractors with prefabrication
  • Fit-out and multi-site contractors
Defined tables
134
Operational views
16
Defined roles
13
Reports
10

Defined in the planned system specification.

What’s inside.

Bring estimates, project costs, materials and subcontractors together from bid to final payment.

Estimates & contracts

Build a clear offer and carry the agreed scope into every project.

Sales Orders Awaiting ApprovalSubmitted
Order NumberAccountContractNet Total

Projects & costs

See the cost of each job alongside its budget, commitments and remaining work.

Budget ReviewPendingApproval
Budget NumberProjectKindCurrency
Approved Revision

Purchasing & subcontractors

Connect supplier commitments, accepted work and bills to the right job.

Purchase Approval QueueSubmitted
Purchase Order NumberSupplierCurrent TotalApproval Basis

Materials & sites

Know what is available, where it is held and what each job has used.

Count Review QueuePendingReview
Count NumberWarehouseCounterPolicy

Production & prefabrication

Turn released designs and actual workshop work into traceable finished assemblies.

Production ScheduleReleased
Work Order NumberOutput ProductPlanned QuantityCompleted Quantity

Billing & collections

Turn agreed progress into clear bills and keep collections tied to the right contract.

Invoices Awaiting ApprovalPendingApproval
Invoice NumberAccountDocument TypeNet Amount
Credit Note

Finance

Bring project economics, supplier obligations and collections into each company’s books.

Revenue ReviewPendingApproval
Assessment NumberContractCutoff AtPeriod

Reporting

Bring project progress, cost and financial obligations into a consistent review.

Project PortfolioActive
Project CodeNameCustomerManager

Your project workspace

Offers DueQuotes
StatusDraftSentAcceptednext 7 days
Draft
QTS-65480ACC-110
QTS-18840ACC-120
Sent
QTS-10501ACC-110
QTS-96792ACC-150
Accepted
QTS-64425ACC-110
QTS-61027ACC-110
Estimates & contracts →
Production ScheduleWorkOrders
StatusReleasedInProgressPartiallyCompletedCompletedPendingClose
07 Sep04 Oct PRD-3508 WO-10910, 17 Sep to 23 Sep, Released PRD-1033 WO-69765, 07 Sep to 16 Sep, InProgress PRD-2921 WO-19403, 15 Sep to 23 Sep, PartiallyCompleted PRD-5417 WO-84596, 21 Sep to 29 Sep, Completed PRD-9708 WO-72620, 23 Sep to 28 Sep, PendingClose PRD-3393 WO-54455, 25 Sep to 04 Oct, Released WO-10910WO-69765WO-19403WO-84596WO-72620WO-54455 today · 17 Sep
  • PRD-3508: WO-10910, 17 Sep to 23 Sep, Released
  • PRD-1033: WO-69765, 07 Sep to 16 Sep, InProgress
  • PRD-2921: WO-19403, 15 Sep to 23 Sep, PartiallyCompleted
  • PRD-5417: WO-84596, 21 Sep to 29 Sep, Completed
  • PRD-9708: WO-72620, 23 Sep to 28 Sep, PendingClose
  • PRD-3393: WO-54455, 25 Sep to 04 Oct, Released
Production & prefabrication →
Count Review QueueInventoryCounts
review waits for the warehouse manager
Approval conditions

Warehouse Manager: Approve InventoryPositions stock release, StockTransfers, Shipments release, InventoryCounts, Returns and ReturnDispositions independently, excluding preparer/counter/subject/material editors

PendingReview
  • IC-81309 WRH-140 in 8 d
  • IC-78146 WRH-150 11 d
  • IC-78164 WRH-110 12 d
  • IC-40095 WRH-130 in 6 d
  • IC-51696 WRH-120 4 d
IC-81309
Warehouse
WRH-140
Counter
KZ
Policy
CP-66363
Lock
CL-34256
PlannedEnd
25 Sep

Review waits for the warehouse manager.

Materials & sites →
Sales Orders Awaiting ApprovalSalesOrders
approval waits for the commercial manager
Approval conditions

current OrderAcceptance AND ContractActivation decisions by independent Commercial Manager are mandatory (SalesOrders Status: Draft → Submitted → Approved), separately or one explicitly joint immutable scope.

Submitted
  • SO-68800 ACC-120
  • SO-56702 ACC-130
  • SO-11093 ACC-130
  • SO-31737 ACC-130
  • SO-66697 ACC-150
SO-68800
Account
ACC-120
Contract
PC-89285
NetTotal
270
CreditReview
CR-55200
Snapshot
DR-39125

Approval waits for the commercial manager.

Estimates & contracts →
Purchase Approval QueuePurchaseOrders
Approval conditions
Approval conditions

Visible to: Finance Manager, Purchasing Manager. Visibility does not establish approval authority.

Submitted
  • PO-59096 VND-187 860
  • PO-77095 VND-162 340
  • PO-24386 VND-130 470
  • PO-48044 VND-138 630
  • PO-31748 VND-045 870
PO-59096
Supplier
VND-187
CurrentTotal
730
ApprovalBasis
860
Currency
CRR-3847
Snapshot
DR-80129

Approval conditions.

Purchasing & subcontractors →
Invoices Awaiting ApprovalInvoices
approval waits for the finance manager
Approval conditions

Finance Manager independently approves every invoice and credit snapshot (Status: Draft → PendingApproval → Approved).

PendingApproval
  • INV-77032 ACC-110
  • INV-32994 ACC-110
  • INV-32862 ACC-110
  • INV-88489 ACC-120
  • INV-53453 ACC-110
INV-77032
Account
ACC-110
DocumentType
Invoice
NetAmount
170
TaxAmount
850
Currency
CRR-9078

Approval waits for the finance manager.

Billing & collections →
Budget ReviewProjectBudgets
approval waits for the finance manager
Approval conditions

Finance Manager independently approves every invoice and credit snapshot (Status: Draft → PendingApproval → Approved).

PendingApproval
  • PB-21157 PRJ-8420 7 d
  • PB-33852 PRJ-9728 8 d
  • PB-17705 PRJ-3861 4 d
  • PB-51786 PRJ-6797 7 d
  • PB-64487 PRJ-8582 12 d
PB-21157
Project
PRJ-8420
Kind
Original
Currency
CRR-8908
EffectiveDate
10 Sep
Snapshot
DR-18418

Approval waits for the finance manager.

Projects & costs →
Revenue ReviewRevenueAssessments
approval waits for the finance manager
Approval conditions

Finance Manager independently approves every invoice and credit snapshot (Status: Draft → PendingApproval → Approved).

PendingApproval
  • RA-11684 PC-29526 4 d
  • RA-69589 PC-92649 in 10 d
  • RA-30622 PC-69608 12 d
  • RA-76929 PC-86404 7 d
  • RA-76465 PC-21764 in 1 d
RA-11684
Contract
PC-29526
CutoffAt
13 Sep
Period
AP-150
TechnicalReview
AD-33273
FinanceDecision
AD-12648

Approval waits for the finance manager.

Finance →
My Site WorkProjectWorkLogs
YouStatusDraftRunningSubmittedRejected
Draft
PWL-54700PRJ-8538360 quantity
PWL-93503PRJ-553630 quantity
Running
PWL-93463PRJ-605760 quantity
PWL-52177PRJ-2290570 quantity
Submitted
PWL-23236PRJ-4279130 quantity
Rejected
PWL-61288PRJ-1945100 quantity
Projects & costs →
Subcontract Acceptance QueueSubcontractAcceptances
StatusSubmittedPendingValuation
Submitted
SA-51105SBC-68712
SA-90407SBC-38957
SA-99790SBC-24451
PendingValuation
SA-71212SBC-72283
SA-96653SBC-44048
SA-45011SBC-67174
Purchasing & subcontractors →
Progress Certification QueueProgressCertificates
StatusReceivedPendingVerificationDisputed
Received
PC-94975PC-94998
PC-26438PC-89636
PendingVerification
PC-28481PC-18449
PC-67708PC-11728
Disputed
PC-62034PC-50160
PC-88516PC-38936
Billing & collections →
Period Close WorkCloseTasks
StatusOpenInProgressReviewRequired
Open
CT-16685AP-110
CT-91458AP-130
InProgress
CT-67862AP-120
CT-47398AP-150
ReviewRequired
CT-17668AP-110
CT-34697AP-140
Finance →
Commitment BoardProjectCommitments
StatusApprovedActivePartiallyFulfilledHeld
Approved
PC-24554PRJ-1393
PC-63110PRJ-1150
Active
PC-57139PRJ-3708
PC-29155PRJ-5853
PartiallyFulfilled
PC-44686PRJ-9961
Held
PC-25910PRJ-5491
Projects & costs →
Project PortfolioProjects
StatusActiveOnHoldOperationallyCompletePendingFinancialClose
Active
PRJ-36977CUS-236
PRJ-15427CUS-211
OnHold
PRJ-68031CUS-145
OperationallyComplete
PRJ-69877CUS-074
PRJ-86080CUS-170
PendingFinancialClose
PRJ-25197CUS-136
Reporting →
Retention DueRetentionBalances
StatusHeldPartiallyReleasedReleasedPartiallySettledDisputed
Held
RB-53466PC-73865
RB-37066PC-76800
PartiallyReleased
RB-92373PC-23778
Released
RB-36558PC-71898
PartiallySettled
RB-20484PC-81580
Disputed
RB-44692PC-84044
Billing & collections →
Warehouse AvailabilityInventoryPositions
StatusActiveBlocked
Available
IP-22982PRD-6695760 on hand
IP-29864PRD-1086420 on hand
Held
IP-53464PRD-399530 on hand
Picked
IP-57485PRD-8459320 on hand
Transit
IP-33677PRD-7920410 on hand
Production. Production is staged but not yet financially issued inventory
IP-18899PRD-1430200 on hand
Materials & sites →

Bring the whole job together

Estimate Comparisondrill-down

Compare Quotes, QuoteLines and EstimateComponents by project, offered revision and accepted alternative using frozen quantities, units, selling assumptions and effective cost/rate evidence; show material, labor, equipment, subcontract and other planned cost separately from accepted price and approved changes, retain reviewed zero versus unresolved cost, and leave margin percentage unavailable when its cost basis is unresolved or its net-price denominator is zero.

opens Budget Review →
opens
Budget ReviewProjectBudgets
Budget NumberProjectKindCurrencyEffective Date
PB-21157PRJ-8420OriginalCRR-890810 Sep
PB-33852PRJ-9728ApprovedRevisionCRR-837209 Sep
PB-17705PRJ-3861OriginalCRR-244313 Sep
PB-51786PRJ-6797ApprovedRevisionCRR-954310 Sep
Projects & costs →
opens
PB-21157ProjectBudgets
  1. Draft
  2. PendingApproval
  3. Approved
  4. Locked
  5. Superseded
Snapshot
DR-18418
BudgetNumber
PB-21157
Project
PRJ-8420
Currency
CRR-8908
Kind
Original
EffectiveDate
10 Sep

owner Finance Manager

pendingapproval

Go from the big picture to the details behind it. Open any record to see its status, owner and history.

Illustrative records. Connections and approval states follow the authored specification.

From quote to payment

Keep every job on budget and moving forward.

Illustrative previews from the system specification.

Quote Sales order approval Pick andship Invoice approval Cashapplied
Shapes describe the work. Approval steps are human tasks.
  1. 01

    Quote

    Build a clear quote for the materials and products your customer needs.

  2. 02

    Sales order

    Turn an accepted quote into a clear delivery commitment.

    Your Commercial Manager confirms the order and delivery commitment.

  3. 03

    Pick and ship

    Prepare the right goods and track delivery to your customer.

  4. 04

    Invoice

    Create accurate invoices from the goods supplied and agreed prices.

    Your Finance Manager checks the goods and amounts being billed.

  5. 05

    Cash applied

    Keep customer balances up to date as payments arrive.

Keep work moving

Decision checkpoints where approval stays with your team.

Sales order

Your Commercial Manager confirms the order and delivery commitment.

Invoice

Your Finance Manager checks the goods and amounts being billed.

Stay in control as you grow

Human approval and system automation have different jobs.

Approval required

Sales order

Your Commercial Manager confirms the order and delivery commitment.

Approval required

Invoice

Your Finance Manager checks the goods and amounts being billed.

System control

Approval chains

Give every team the right tools

Offers DueDraft
Quote NumberAccountValid UntilNet Total

Estimator

Prepares customer offers and accepted-scope requests using actual commercial evidence.

Project PortfolioActive
Project CodeNameCustomerManager

Commercial Manager

Independently accepts customer commitments and commercially reviews applications for payment.

Budget ReviewPendingApproval
Budget NumberProjectKindCurrency
Approved Revision

Project Manager

Controls project scope, technical budgets, forecasts and independent accepted work.

My Site WorkDraft
Work NumberProjectSiteResource

Site Supervisor

Records site facts and independently accepts actual internal field work.

My Site WorkDraft
Work NumberProjectSiteResource

Project Worker

Performs assigned field work and records actual quantities and effort.

Warehouse AvailabilityActive
ProductWarehouseLocationLot

Warehouse Operator

Records physical receiving and executes approved material custody and goods delivery.

Count Review QueuePendingReview
Count NumberWarehouseCounterPolicy

Warehouse Manager

Controls physical stock, location eligibility and independent stock exceptions.

Purchase Approval QueueSubmitted
Purchase Order NumberSupplierCurrent TotalApproval Basis

Purchasing Manager

Prepares supplier commitments and independently approves eligible procurement scope.

Production ScheduleReleased
Work Order NumberOutput ProductPlanned QuantityCompleted Quantity

Production Manager

Controls versioned prefabrication instructions, actual work acceptance and quantity closure.

Production ScheduleReleased
Work Order NumberOutput ProductPlanned QuantityCompleted Quantity

Production Operator

Performs released prefabrication and records actual material and operation facts.

Revenue ReviewPendingApproval
Assessment NumberContractCutoff AtPeriod

Accountant

Prepares and executes guarded financial allocations and reconciliations.

Invoices Awaiting ApprovalPendingApproval
Invoice NumberAccountDocument TypeNet Amount
Credit Note

Finance Manager

Independently controls financial authority, recognition, valuation and final close.

See where each job stands

Start with the question. Follow it to the records behind the answer.

Drill-down

Estimate Comparison

Compare Quotes, QuoteLines and EstimateComponents by project, offered revision and accepted alternative using frozen quantities, units, selling assumptions and effective cost/rate evidence; show material, labor, equipment, subcontract and other planned cost separately from accepted price and approved changes, retain reviewed zero versus unresolved cost, and leave margin percentage unavailable when its cost basis is unresolved or its net-price denominator is zero.

View Budget Review
Source view · Illustrative records
Budget ReviewPendingApproval
Budget NumberProjectKindCurrency
Approved Revision
Drill-down

Project Budget and Forecast

At one project/cost-code/currency cutoff, compare original and approved revised ProjectBudgets/ProjectBudgetLines with signed actual ProjectCostEntries/ProjectCostAllocations and the independently approved ProjectForecasts/ProjectForecastLines; forecast final cost equals the comparable actual expense plus disjoint RemainingCost only when both are known, while remaining commitments and owned unused materials are separately disclosed with their included/excluded forecast basis so they cannot be added twice.

View Budget Review
Source view · Illustrative records
Budget ReviewPendingApproval
Budget NumberProjectKindCurrency
Approved Revision
Drill-down

Commitments and Subcontract Cost

Reconcile approved PurchaseOrderLines and SubcontractLines through ProjectCommitments, receipt or subcontract acceptance, SubcontractAccruals and BillMatches by supplier/project/cost code and source currency; show gross increases, reductions already included in net current authority, fulfilled scope, active claims and unperformed remainder separately from accepted expense, remaining accrual, billed AP and payment, with known-zero accepted work visible and unknown valuation unresolved.

View Commitment Board
Source view · Illustrative records
Commitment BoardApproved
Commitment NumberProjectCost CodeCurrency
Drill-down

Material Availability and Use

Reconcile InventoryPositions, StockLayers, reservations and StockEvents with project requirements, material usage and transfer/return history by entity/product/location/required lot or serial at a retained cutoff; report owned quantity and current carrying separately from customer/vendor custody, available versus held or claimed stock, actual job consumption and issued production WIP, excluding internal transfers and repeat supplier billing from new project expense.

View Warehouse Availability
Source view · Illustrative records
Warehouse AvailabilityActive
ProductWarehouseLocationLot
Drill-down

Prefab Cost and Variance

Reconcile released WorkOrders with accepted ProductionEntries, terminal ProductionCompletions and signed WorkOrderCostEntries by entity/order/output and dated functional-cost basis; disclose issued and returned material, accepted labor/overhead, frozen output standard, allocated actual WIP, immediate signed variance, scrap and remaining WIP, while tracing finished-stock use and existing variance attribution to the project without creating a second cost from intermediate progress, closure or managerial allocation.

View Production Schedule
Source view · Illustrative records
Production ScheduleReleased
Work Order NumberOutput ProductPlanned QuantityCompleted Quantity
Drill-down

Progress and Billing Position

Compare current accepted ProjectContracts/SalesOrderLines with cumulative ProgressApplications, externally evidenced ProgressCertificates and conserved BillingObligations/BillingAllocations by contract and source currency; show certified-to-date, prior certified increments, active billing claims, gross billed, conditional/unconditional retention and eligible unbilled scope independently of paid cash, preserving the same stored-material amount through installation while allowing separately priced installation work and a separately assessed first revenue-recognition delta.

View Progress Certification Queue
Source view · Illustrative records
Progress Certification QueueReceived
Certificate NumberContractApplicationExternal Certifier
Drill-down

Revenue and Contract Balances

Reconcile approved RevenueAssessments/RevenueAssessmentLines and effective PerformanceAllocations with signed ContractBalanceMovements at the reviewed accounting-contract unit, retaining obligation-level allocated price, evidence and recognized/billed/assigned-advance components; present the net contract asset or liability only after same-unit aggregation, keep unconditional AR and tagged conditional retention from being counted again, and preserve reviewed monetary classification, historical nonmonetary advance basis, current carrying and attributable FX without netting unrelated contracts or entities.

View Revenue Review
Source view · Illustrative records
Revenue ReviewPendingApproval
Assessment NumberContractCutoff AtPeriod
Drill-down

Retention and Advances

Reconcile RetentionBalances/RetentionMovements and AdvanceAllocations with their original contract, invoice/bill, cash and settlement sources by entity/counterparty/currency at the cutoff; disclose total outstanding, held and released-unsettled retention, conditional versus unconditional entitlement, actual funded assignments, prior recoveries, purpose releases and active claims, treating ordinary retention release as redistribution rather than settlement and an unpaid billed advance as non-spendable until its separately evidenced cash path occurs.

View Retention Due
Source view · Illustrative records
Retention DueHeld
Retention NumberSideContractSubcontract
Supplier
Drill-down

Receivables and Payables Aging

Age remaining Invoices and Bills by company, counterparty, source currency and actual due-date bucket after posted applications, credits and signed corrections at the cutoff; show held retention, released-unsettled amounts, unapplied receipts, customer or supplier advances and surplus credits separately, reconcile source balances and current functional carrying including prior FX, and exclude unbilled contract assets and accepted-but-unmatched subcontract accruals from ordinary invoiced AR/AP totals.

View Retention Due
Source view · Illustrative records
Retention DueHeld
Retention NumberSideContractSubcontract
Supplier
Drill-down

Local Financial Statements

Produce each entity's trial balance, income statement and balance-sheet mappings from posted JournalEntries/JournalLines in the selected period/cutoff, retaining original and compensating effects with balanced functional debits and credits; reconcile stock, production WIP, accepted subcontract accruals, resource absorption and actual-cost clearing, net contract positions, receivables, payables, retention and advances to their distinct sources and opening controls, with no cross-entity netting, implicit consolidation or second journal from a report.

View Revenue Review
Source view · Illustrative records
Revenue ReviewPendingApproval
Assessment NumberContractCutoff AtPeriod
All reports and dashboards

AI support across your projects

Let your AI agent help with everyday work. Set its permissions during setup and keep approvals with your team.

Construction ERPShared data, controlled access Estimates, contractsand project workEstimating inputsin Contract documents and...in Field effort and equipment...in and out Customer progress evidencein and out Materials, productionand subcontractorsReceiving and site stockin and out Prefabrication capturein and out Subcontract applicationsInvoices ↕ Returns and correctionsReturns ↕ Finance and reportingBank and cash evidencein and out Accounting treatmentAccounts ↕ · Invoices ↕ Financial exportsin and out Opening datain Your agent
  • Estimates, contracts and project work
    • Estimating inputsin
    • Contract documents and changesin
    • Field effort and equipment usagein and out
    • Customer progress evidencein and out
  • Materials, production and subcontractors
    • Receiving and site stockin and out
    • Prefabrication capturein and out
    • Subcontract applicationsInvoices, SubcontractApplications · in and out
    • Returns and correctionsReturns · in and out
  • Finance and reporting
    • Bank and cash evidencein and out
    • Accounting treatmentAccounts, Invoices, ProgressApplications · in and out
    • Financial exportsin and out
    • Opening datain
  • Agents
    • Your agentWorks within the permissions you assign
Explore integrations →

Your agent works within the permissions you assign.

List the work that needs attention. Keep the approval with the assigned reviewer.

Download agent Agent setup guide
Illustrative exampleAfter configuration
$ curl -fsSL https://www.erp.ai/skill.md

› open Construction ERP and list records waiting on sales order
Order-to-cash · records listed with owner and age

› approve the first one at sales order, as its approver
Approval requiredWaiting for the assigned reviewer
FAQ

Your questions, answered.

How the system works, what you can configure and how to get started.

How do I get started?+

Select Start now to create your account. Explore the system specification, or use Proto to configure it for your business.

What does Construction ERP cover?+

Estimates and contracts, project costs, purchasing and subcontractors, site materials, in-house prefabrication, customer billing and each company's local finance. The modules show how these parts connect from bid to final payment.

Who is it designed for?+

Commercial general contractors and specialty contractors managing project work, materials and subcontract packages. It also supports contracting businesses with in-house prefabrication and work across several sites or companies. The industry pages describe typical operating patterns.

How do estimates become project budgets?+

The accepted estimate preserves its quantities, cost assumptions, offered price and revision. The approved project budget and customer contract retain their own purposes and owners. Later changes preserve the original baseline and apply only after the relevant review.

When does a cost become an actual project cost?+

Actual material consumption, accepted field effort, accepted subcontract work and eligible direct charges supply the cost sources. Materials still held in the warehouse or at an owned site remain inventory. Purchasing, supplier billing and payment do not each add the same cost again.

How are subcontractors managed?+

Follow agreed scope, rates, approved changes, work applications and independently accepted performance. Bills match the eligible accepted work, with advances, retention and remaining commitments tracked separately. Differences remain available for review before settlement.

What kinds of progress billing are included?+

The scope supports fixed-price milestones or measured progress and unit-rate work. Applications preserve completed work, eligible stored materials, customer certification and previous billing. Contract terms determine advances and retention; a prior unpaid application does not make the same work billable again.

Does an invoice determine revenue automatically?+

The reviewed recognition schedule follows the contract's performance obligations and selected output-progress or point-in-time evidence. Billing and collections retain their own effects. Finance reviews contract assets, liabilities and balances alongside the project result.

How is retention handled?+

Track the retained amount, its contractual conditions, current classification and release evidence. Releasing retention makes an existing amount eligible for the appropriate next step without creating a second sale or job cost. Rates, tax treatment and deadlines are agreed from the actual contract and company policy.

Can we make assemblies before installation?+

Yes. Bills of material, routing and released work orders support actual materials, work, accepted finished output and cost reconciliation. Finished assemblies can move to site and enter project cost when used. The prefabrication process describes that flow.

How does it handle several companies and currencies?+

Each company keeps its own ownership, approval authority and local books. Document, functional and settlement currencies remain explicit, with current balances and currency differences available for review. Additional consolidation, statutory and external connection requirements are agreed during implementation.

How is it priced?+

The pricing page explains platform usage and the separately priced implementation work. Estimate usage from the records, imports, connected processes and assistant activity expected across your projects.

Implementation

Build the first rollout around a job, its delivery and its financial result.

Read the implementation plan
  1. 01

    Define the contracting model

    Confirm companies, projects, sites, counterparties, cost codes and approval limits. Agree estimate components, billing bases, retention and advance terms. Identify the recognition evidence and accounting treatment for each contract, plus actual sources for field work, subcontract acceptance and materials.

    Team and ERP.ai
  2. 02

    Configure and exercise the first job

    Prepare approved masters, units, rates, accounts and any prefabrication recipes. Follow an accepted bid through purchasing, site use, work acceptance, progress application, invoice and collection. Include partial work, a variation, a return and the actual retention or advance path where used.

    Team and ERP.ai
  3. 03

    Reconcile the opening position

    Map accepted contracts, approved budgets, remaining commitments, site stock, production work in progress and costs already recognized. Reconcile one opening ledger with nonposting customer and supplier detail, prior certification and billing, contract assets or liabilities, retention, advances and partial settlement. Preserve original identifiers and currency carrying amounts.

    Team and ERP.ai
  4. 04

    Verify and enable the first scope

    Confirm access, independent decisions, quantity conservation and financial reconciliations with the responsible teams. Resolve uncertain outcomes, agree the cutoff and approve the opening position. Train users and enable new eligible work, then expand after reviewing the first results.

    Team and ERP.ai

Pricing

The base account and ordinary manual work in ERP.AI's official interface are $0. Viewing, searching, creating, editing, approving, deleting and exporting records in that interface do not consume read or write credits. There is no per-user fee.

Machine work: external API-key requests, imports, workflows, agents and scheduled jobs. Successful external API-key reads and writes use the operation rates below. Starting a managed execution from the interface still starts that metered service.

Pricing and account rules
Credit rate card
Machine workIncluded per $1 of credit
List/filter or get record calls20,000
Search or aggregate calls4,000
CSV or PDF exports100
Record writes4,000
Imported or synced records200,000
File upload in MB2,000
Workflow runs2,000
Code-node compute beyond included in CPU-sec12,000
Agent executions2,000
Scheduled jobs or webhook activations20,000

Read and write rates apply to successful external API-key requests. Ordinary manual work in the ERP.AI interface is $0.

prepaid creditsSmallest pack $5, purchased credits never expire.

Go deeper

Explore the complete system.

Follow the operating model from the process to the people, records and decisions behind it.

Industries

Commercial contractors Connect the accepted bid with project delivery, subcontractors and financial results.Specialty contractors Plan trade work, follow site materials and see what each job costs.Contractors with prefabrication Connect workshop production with site installation and project costs.Fit-out and multi-site contractors Keep each site accountable while sharing purchasing and company finance.

Reference

Roles and permissions Give commercial, project, site and finance teams clear responsibilities.Reports and insights Understand project costs, billing progress and company performance.Data model Explore the records connecting contracts, project work and company finance.Integrations Connect project documents, site evidence and finance through agreed sources.Implementation Build the first rollout around a job, its delivery and its financial result.AI assistants and API Help teams prepare work, follow projects and investigate differences.

Start

Pricing No per-user fees. Pay for automation as you use it, with implementation priced separately.Frequently asked questions Answers about project costs, subcontractors, billing and implementation.Get started Bring a representative job and build the rollout around its real work.
ERP•AI workspace

Make it work your way.

Use Proto to configure this system for your business. Review fields, rules and approvals before releasing changes.

Start now Download agent

Previews contain illustrative data from the system specification.

More ERP systems

See all →
ManufacturingPlanned

Manufacturing ERP

From material plans to finished products.

  • BOM revisions
  • Component quantities
  • Work-center capacity
  • Routing steps
  • Production logs
  • Scrap tracking
Start now Explore
ERPPlanned

Enterprise ERP

Stay in control as your business grows.

  • Multi-entity ledger
  • Pipeline and quotes
  • Three-way match
  • Payroll runs
  • MRP and work orders
  • Consolidation
Start now Explore
DistributionPlanned

Distribution ERP

Keep orders moving. Stay in control.

  • Warehouse inventory
  • Dealer orders
  • Delivery routes
  • Item master
  • Order-to-cash
  • Procure-to-pay
Start now Explore
DistributionPlanned

Distribution & Supply Chain

Keep supply and delivery in step.

  • Purchase management
  • Inventory tracking
  • Delivery coordination
  • Item master
  • Order-to-cash
  • Procure-to-pay
Start now Explore
ManufacturingPlanned

Manufacturing ERP & CRM

From customer demand to finished goods.

  • Customer records
  • Sales pipeline
  • Production management
  • Item master
  • Order-to-cash
  • Procure-to-pay
Start now Explore
Retail & e-commercePlanned

Retail & E-commerce ERP

Keep stores and online sales in sync.

  • Store orders
  • Online orders
  • Inventory tracking
  • Order-to-cash
  • Item master
  • Procure-to-pay
Start now Explore
TradingPlanned

Trading ERP

Keep orders moving. Know your margins.

  • Purchase & sales
  • Warehouse inventory
  • Margin tracking
  • Letters of credit
  • Item master
  • Order-to-cash
Start now Explore
Food & beveragePlanned

Food & Beverage ERP

Keep production moving and every batch traceable.

  • Recipe management
  • Batch tracking
  • Shelf-life tracking
  • Item master
  • Order-to-cash
  • Procure-to-pay
Start now Explore
Hotels & hospitalityPlanned

Hospitality ERP

Keep rooms ready and hotel operations in sync.

  • Room bookings
  • Food & beverage
  • Housekeeping
  • PMS integration
  • Item master
  • Order-to-cash
Start now Explore
Healthcare & hospitalsPlanned

Healthcare ERP

Keep healthcare operations supplied and connected.

  • Item master
  • Order-to-cash
  • Procure-to-pay
  • Standard costing
  • Multi-entity
  • Approval chains
Start now Explore
Education & trainingPlanned

Education & School ERP

Keep every campus ready for the next term.

  • Item master
  • Order-to-cash
  • Procure-to-pay
  • Standard costing
  • Multi-entity
  • Approval chains
Start now Explore
Apparel, textiles & footwearPlanned

Apparel & Footwear ERP

From seasonal collections to orders ready to ship.

  • Item master
  • Order-to-cash
  • Procure-to-pay
  • Standard costing
  • Multi-entity
  • Approval chains
Start now Explore
Metal fabricationPlanned

Metal Fabrication ERP

Keep fabrication jobs on schedule and costs in view.

  • Item master
  • Order-to-cash
  • Procure-to-pay
  • Standard costing
  • Multi-entity
  • Approval chains
Start now Explore
Packaging & paperPlanned

Packaging & Paper ERP

Turn approved packaging designs into orders ready to ship.

  • Item master
  • Order-to-cash
  • Procure-to-pay
  • Standard costing
  • Multi-entity
  • Approval chains
Start now Explore
Medical devicesPlanned

Medical Device ERP

Bring device production and traceability together.

  • Item master
  • Order-to-cash
  • Procure-to-pay
  • Standard costing
  • Multi-entity
  • Approval chains
Start now Explore
ERPPlanned

ERP for Small Business

Keep your books, customers and team in step.

  • Customer invoicing
  • Bills and expenses
  • Bookkeeping
  • Sales pipeline
  • Payroll
  • Leave balances
Start now Explore
Retail & e-commercePlanned

ERP for Retail

Bring your stores, stock and customer rewards together.

  • POS integration
  • Store management
  • Loyalty programs
  • Inventory tracking
  • Purchasing
  • Retail accounting
Start now Explore
Education & trainingPlanned

ERP for Education

Keep the next term on track.

  • Student records
  • Fee schedules
  • Admissions review
  • Faculty timetables
  • Attendance
  • Campus finance
Start now Explore
AutomotivePlanned

ERP for Automotive

Finance, sales orders and purchasing, in one system.

  • Item master
  • Order-to-cash
  • Procure-to-pay
  • Standard costing
  • Multi-entity
  • Approval chains
Start now Explore
Apparel, textiles & footwearPlanned

ERP for Textiles

Finance, sales orders and purchasing, in one system.

  • Item master
  • Order-to-cash
  • Procure-to-pay
  • Standard costing
  • Multi-entity
  • Approval chains
Start now Explore
PharmaceuticalsPlanned

ERP for Pharma

Finance, sales orders and purchasing, in one system.

  • Item master
  • Order-to-cash
  • Procure-to-pay
  • Standard costing
  • Multi-entity
  • Approval chains
Start now Explore
Real EstatePlanned

ERP for Real Estate

Finance, sales orders and purchasing, in one system.

  • Item master
  • Order-to-cash
  • Procure-to-pay
  • Standard costing
  • Multi-entity
  • Approval chains
Start now Explore
AgriculturePlanned

ERP for Agriculture

Finance, sales orders and purchasing, in one system.

  • Item master
  • Order-to-cash
  • Procure-to-pay
  • Standard costing
  • Multi-entity
  • Approval chains
Start now Explore
PharmaceuticalsPlanned

ERP + Quality for Pharma

Finance, sales orders and purchasing, in one system.

  • Item master
  • Order-to-cash
  • Procure-to-pay
  • Standard costing
  • Multi-entity
  • Approval chains
Start now Explore
Not quite it?

Describe the system you need. Proto drafts it in a private workspace.

Describe it

For construction

See all →
ConstructionPlanned

CPQ for Building Materials

Configurator, pricing rules and quotes, in one system.

  • Bundles
  • Discount thresholds
  • Approval matrix
  • Quote versions
  • Guided selling
  • Price books
Start now Explore
ConstructionPlanned

PM for Construction

Projects, tasks and resources, in one system.

  • Milestone billing
  • Utilisation
  • WIP
  • Change orders
  • Rate cards
  • Earned value
Start now Explore
ConstructionPlanned

Construction Punch List

Projects, tasks and resources, in one system.

  • Milestone billing
  • Utilisation
  • WIP
  • Change orders
  • Rate cards
  • Earned value
Start now Explore
ConstructionPlanned

PSA for Construction Projects

Engagements, resources and timesheets, in one system.

  • Retainers
  • SLA tracking
  • Utilisation
  • Rate cards
  • Work order dispatch
  • Renewals
Start now Explore
ConstructionPlanned

GRC for Construction

Risks, policies and controls, in one system.

  • Risk register
  • Controls testing
  • Segregation of duties
  • Attestations
  • Regulatory calendar
  • Evidence trail
Start now Explore
ConstructionPlanned

Construction + PM + Accounting + HR

General ledger, ap and ar and bank reconciliation, in one system.

  • Journal approvals
  • Aging
  • Accruals
  • Fixed assets
  • Trial balance
  • Consolidation
Start now Explore
ConstructionPlanned

Construction Project Tracker

Projects, tasks and resources, in one system.

  • Milestone billing
  • Utilisation
  • WIP
  • Change orders
  • Rate cards
  • Earned value
Start now Explore
Not quite it?

Describe the system you need. Proto drafts it in a private workspace.

Describe it

Customize Construction ERP. With Proto, your desktop AI agent.

Ask Proto to help you customize Construction ERP.

Customize
Construction ERP.
Ask: “Adapt Estimates & contracts.”
ProtoYour desktop AI agent
Download nowFree install · ~1 GB · AI usage extra
macOSWindowsLinux

Bring your first idea to Proto.

Keep this page open while you install Proto. Connect your account and model, then paste this into a new chat.

AI usage is paid separately. You can edit the prompt before copying.

ERP.AI

Business apps and the Proto desktop agent.

  • Business Apps
  • Proto
  • Workflows
  • Headless SaaS
  • Enterprise
  • Pricing
  • Contact
  • Terms of Service
  • Privacy Policy
  • Cookie Policy
© 2026 ERP•AI. All rights reserved.
System status

Your Privacy, Your Choice

We use essential cookies to run the site and optional cookies for features, analytics, and relevant content. See Cookie policy

Manage Your Cookie Preferences

We use cookies to enhance your experience, analyze site traffic, and serve relevant content. By clicking "Accept All," you agree to our use of cookies. You can customize your preferences at any time.

Learn more about how we use cookies

These cookies are required for the website to function properly. They ensure security, enable basic features like page navigation, and store user session data. You cannot disable these cookies.

These cookies enable additional features that enhance your experience, such as live chat, video playback, personalized content recommendations, and remembering user preferences.

These cookies help us understand how visitors interact with our site by collecting anonymous usage data. This allows us to measure performance, detect issues, and continuously improve the user experience.

These cookies allow us and advertising partners, including X, to deliver ads tailored to your interests. They track browsing habits across sites to provide relevant advertising and measure ad effectiveness.